Ripples Under the Rails
Beneath the crusty cast pillars
Frozen ridges in russetty rock, relic of
Forgotten tides ebbing from the foreshore,
Compressed moment in time, stasis.
From under the earth, drilled blown and split,
Cut and dressed, mallet and cold chisel, lifted
Block and tackle to wagon and rail,
Lifted and lowered, jointed, bedded and faced.
Beached above high water, breached by winter gales
Facing the shifting strands of the surging sea,
Mudstone moulded from silty sand
Reformed in angular conformity.
Stanchions standing still
Memories of a weighty feat
Steam drove piles deep down
Spanning the divide.
Girder beams and rails run over the estuary
Building problems, sinking on the heathery bog
A mile of iron-y to carry its ore
Shiny ruddy haematite across northwards.
Elemental forces test its metal,
Water freezes, split columns,
Ice floes collide and crash,
Broken bridge.
Mended, revived by World War
Carrying the seeds of death south,
Years of labour’s lost,
Helplessly hoping for peace.
Wee Free bridge, Bowness beer on Sundays,
John Barleycorn calls across the waters,
Wobbling back over sleepers to Alba
Sabbath man is full of ale.
Linking former foes, the Solway Viaduct,
Before Bouche’s ill-fated Tay Bridge
Lesser losses tumbled to the brackish water,
When Brunlee’s bridge was broken up
No McGonagall opus to immortalise the decaying
Remains across the brackish Solway
Embanked piers still reach out
From both sides of the Eden.
Notes
The Solway Viaduct was opened in 1869 as part of the Solway Junction Railway crossing the Solway Estuary between Bowness-on-Solway and Annan and linked to the Maryport to Carlisle and the Caledonian Lines. Its original purpose was to transport iron ore from Cumberland to the Ayrshire and Lanarkshire Ironworks. The viaduct was the longest in Europe at the time a total length of just over 1 mile, the piles and columns were constructed of 2,892 tons of cast iron using a steam pile driver, the superstructure was of girder construction using a further 1,807 tons. There were 193 spans of 30 feet each. Surprisingly perhaps it was the crossing of the raised bog at Bowness that provided the bigger challenge in construction of the line. In the building of the bridge Port Carlisle, already struggling, was effectively shut off from any larger shipping and Silloth became the port for Carlisle.
Thursby born Thomas Bouche, engineer of the first Tay Bridge, was not given the contract for the railway or viaduct, despite having constructed several Cumbrian and Westmorland railway lines and viaducts. However, this was perhaps fortunate given the disastrous bridge failure that led to the Tay Bridge Disaster, constructed ten years after the Solway Viaduct. Despite this the Solway Viaduct was not without its troubles. In the severe winter of 1875 water froze in the columns splitting several of them, these were repaired but in the next severe winter of 1881 ice floes came down the Eden and Esk piling up and refreezing into icebergs up to 6 feet thick some 27 yards square odd feet across, these battered the stanchions and around 300 were broken leaving a damaged length of 3-400 yards, these were again repaired despite this obvious shortcoming.
Economically the line made a good start but business tailed off as this was a second line to the Caledonian line. In 1914 it closed to passenger traffic and had a brief spell of profitability during the First World War due to its proximity to the armament’s factories at Eastriggs. It was finally closed in 1931, although still used by people to cross over to drink beer at Bowness on Sunday. It was finally demolished in 1934, three men died during demolition when a boat capsized; surprisingly Though no deaths were recorded in its construction. The Iron was sold to Japan who, it is said, used it to strengthen their arsenal of military hardware prior to the Second World War.
Photographs of the extant viaduct can be seen here: http://http://www.cumbria-railways.co.uk/solway_viaduct.html
Credit: Old photograph of Solway Viaduct, D.S. Barrie (Aston & Barrie, 1932; p. 27).